Location
Iraq-Basa- Al_Twaisa
Mobile
+964 780 2711117
Email
info@aljuhdco.com
Get A Quote

Laying carbon steel pipeline dia. 42-inch, 60 km length from the main storage to the export.

ClientSOC
Location of Project From Zubair oil filed to the Faw port
Size-Area of the works 60 KM
Value of Contract US$55,000,000 $

Laying carbon steel pipeline dia. 42-inch, 60 km length from the main storage to the export.

The works of project-included installation, wilding, fabricate and connections carbon steel pipeline 42-inch dia., 60 km length with all NDT test.